Click the "Read More..." button to learn about Building Permit Fees, Plumbing Permit Fees, Mechanical Permit Fees, and Wrecking and Moving Fees.
Building Permit Fees
- The following table shall be used for permits required by the IBC and IRC as adopted by the City of Federal Heights.
- Plan review fee shall be 65% of the Building Permit Fee.
- Plan review fee shall be collected at the time of the permit application submittal.
- Permits for fences, roofing, signs and similar construction that do not require an associated plan review shall have the plan review fee waived.
- Valuations shall be established by Section 8-1-2.F. of the Federal Heights Municipal Code.
- Separate permits shall be required for building, electric, mechanical and plumbing.
- Fire Operational Permits:
- $50 per event
- $50 per annual permit
| Other Inspections and Fees: |
|
- Inspections outside of normal business hours
(minimum charge-two hours)
|
$47.00 per hour1 |
- Reinspection fees assessed under provisions of Section 305.8
|
$47.00 per hour1 |
- Inspections for which no fee is specifically indicated
(minimum charge-one-half hour)
|
$47.00 per hour1 |
- Additional plan review required by changes, additions or revisions to plans
(minimum charge-one-half hour)
|
$47.00 per hour1 |
- For use of outside consultants for plan checking and inspections, or both
|
Actual Costs2 |
| $1.00 to $500.00 |
$23.50 |
| $501.00 to $2,000.00 |
$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 |
| $2,001.00 to $25,000.00 |
$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 |
| $25,001.00 to $50,000.00 |
$391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 |
| $50,001.00 to $100,000.00 |
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 |
| $100,001.00 to $500,000.00 |
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof,to and including $500,000.00 |
| $500,001.00 to $1,000,000.00 |
$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 |
| $1,000,001.00 and up |
$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof |
- Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
- Actual costs include administrative and overhead costs.
|